Client Overview
St Catherine’s Health Centre, located in the Wirral, opened its doors in 2013 and was conceived as a pioneering ‘smart’ healthcare facility. With sustainability embedded in its design, the building integrated intelligent systems to optimise heating, cooling, and energy use — significantly reducing environmental impact and operating costs. At the core of this infrastructure was a sophisticated Building Management System (BMS), designed to monitor and control the centre’s energy and utility usage.
Client Objectives
St Catherine’s Health Centre identified a clear set of operational and sustainability goals to modernize its infrastructure, improve energy performance, and ensure long-term system resilience, including:
Our Approach
Inteb supported the Trust with a complete BMS upgrade, following a successful tender process which evaluated multiple suppliers. As a local provider with prior experience working with the Trust on sustainability consultancy, Inteb mobilised its technical and commercial teams to lead the project.
Our methodology included:
Results
The partnership between Inteb and the Trust delivered tangible improvements in system performance, sustainability, and day-to-day operational control, including:
Testimonial
“Working with Inteb on this critical upgrade has been a seamless and highly beneficial process. Their ability to deliver state-of-the-art technology within a tight timeframe and on budget has ensured that St Catherine’s Health Centre continues to operate at peak efficiency while upholding its commitment to sustainability. The professionalism and conduct of Inteb’s team on-site were exemplary, making the process smooth and stress-free.”
Phil Taylor – NHS Estates Team
“At Inteb, we are proud to have partnered with the Trust on this forward-thinking and sustainability-driven project. St Catherine’s Health Centre is a prime example of how smart building technology can be utilised to create energy-efficient, cost-effective, and future-proofed environments. Our team worked closely with Phil Taylor, Carl Fletcher, and the wider Estates and Procurement teams to ensure a smooth transition to the new system. Completing the project within five weeks was a challenge we fully embraced, recognising the importance of minimising disruption while maximising value. As a local business, it is particularly rewarding to contribute to the success of such a flagship facility within our community.”
Les Edwards – Commercial Director, Inteb
Conclusion
Inteb’s upgrade of the BMS at St Catherine’s Health Centre has strengthened the Trust’s focus on sustainability, efficiency, and smart infrastructure.
The new system delivers greater control, improved energy performance, and future-proofed functionality — all completed within a five-week window and on budget.
This project highlights the value of investing in intelligent building systems to enhance operational performance while reducing environmental impact. Inteb remains a trusted partner in supporting the Trust’s ongoing sustainability goals.